Bit of a delay. The supervisors said the base material that was under our Geotex has way too much sand content so they have to remove all that and then replace it with 10-15 dump truck loads of better base material. Fortunately there is major earth moving going on all around our field so the contractor said he would provide the material free of charge.
Second delay is we have a storm brewing in the gulf and that has all that sort of work on hold for the time being. Hopefully get started in another week or so when things dry out.
Second delay is we have a storm brewing in the gulf and that has all that sort of work on hold for the time being. Hopefully get started in another week or so when things dry out.